A Day in the Life of a Civil Engineer – Day 22

Day 22

Parking Lot Planning

This morning a couple of us discussed the parking lot we are planning to build in our downtown. The project engineer for the job submitted the necessary documents to our planning department for the planning commission hearing we will have Sept. 8th. I also talked to a landscaper who will put together a preliminary landscape design for the lot and set up a meeting with him on site for this Thursday. The project engineer touched base with our lighting consultant to make sure we would have a preliminary lighting plan done in time for the hearing. And finally I reviewed the revisions we had all made to the agreement with one of the property owners from whom we will be getting easements for a portion of the lot.

Road Project

The contractor has been in this week finishing up some minor work on this year’s road project. And the project engineer and our technician have been measuring quantities like crazy. But now is the time when our thoughts begin to turn to next year’s road project. So today I set up some times this week for us to drive the roads. During this “road trip” we rate the roads, note the ones that could possibly be crackfilled, and check out any other issues or problems. It’s the one time of the year we can really take a comprehensive view of all the roads at once. I also updated the ratings in our GIS for the roads we improved this year and printed out maps to use during our drive.

Permit Review

I finalized the review of a small project someone had proposed for a commercial development in the city. Then I sent out the approval letter to the developer and a few staff members. Tomorrow I will work on another permit we have in that includes a stormwater permit application.

Sign installation

Water Main Project

During the morning, I also researched the property ownership for a parcel through which we would like to place a new water main. Then I contacted the business to set up a meeting with them to discuss the possibility of the city getting an easement.

Street Sign Upgrade Requirements Rescinded

Our city administrator also sent out a letter today that indicates we will probably not have to upgrade our signs to meet the new retroreflectivity requirements by the date that had been set by the FHWA. Instead we can upgrade the sign at the time of replacement. This will save a significant amount of money for many agencies. Here’s a link to the press release by the U.S. DOT:

http://www.dot.gov/affairs/2011/fhwa4311.html

Share

Original post

Leave a Comment

Leave a comment

Leave a Reply