Day 72
Government Day
In the morning, several of us participated in the city’s government day. For this event, we invite students from the high school to spend the day with us learning more about what we do. We all met at city hall to pick up the students assigned to us and then headed out to take them on a tour of public works facilities. First we went to the wastewater plant where our operator told them about the treatment process. Then we all went to the water plant to see how we treat the drinking water. We also stopped at our public works offices and garage to show them the equipment and check out the GIS department. And finally we toured our generation facility where we have five large engines that run on natural gas and generate up to 30 MW of power. After the tour, we met up with other staff and students from city hall to eat lunch.
Miscellaneous (& still no response from PACE on the bid tab!)
The rest of the day was spent handling a lot of small, miscellaneous issues. Our concrete contractor was in town pouring the last of the sidewalks that were removed to correct trip hazards. I also contacted IDOT to find out some answers to questions about material inspection for a past job. Our consultant putting together the easements for the water main extension revised the incorrect plat and got it back to us. And I tried to call PACE one last time to check on where my bid tab is for that job – they still have not gotten it to me, and I believe they have gone past the legal date for doing so. Rather than immediately contact the attorney general’s office, I thought I would call one last time to see why they have not sent me the bid tab. But no one answered the phone so I had to leave a message. If I don’t hear from them soon, I will unfortunately have to contact the state to notify them they are delinquent on filling my FOIA request. I just don’t understand what the big deal is about releasing a simple bid tab for a project worth over a million dollars.
Leave a Reply
You must be logged in to post a comment.